Equipment and Calibration History

History for Hukseflux NR01 2466

Rec No.DateLoc FromTitleLoc ToNotes
5503 2021-09-02 Sherman Wetland Net Radiometer 4-way Moved Gilbert Tract Net Radiometer 4-way Moved from SW to GT with the decomissioning of SW and the beginning of GT
2291 2016-05-24 Lab none Installed Sherman Wetland Net Radiometer 4-way Installed on the Sherman Wetland tower at the initial set up of the site.
1972 2015-04-10 Factory Calibration Factory Initial factory calibration:
4 components
Component SWin sn4057 2015-03-26
a0 = 0
a1 = 13.92 uV/(W/m2)
Component SWout sn4058 2015-03-26
a0 = 0
a1 = 15.09 uV/(W/m2)
Component LWin sn3998 2015-02-03
a0 = 0
a1 = 13.54 uV/(W/m2)
Component LWout sn3999 2015-02-03
a0 = 0
a1 = 14.14 uV/(W/m2)