Equipment and Calibration

View History

Equipment Entry

Instrument:Net Radiometer
Manufacture:Hukseflux
Model No:NR01
Serial No:2418
Tag No:
Acquisition Date:2015-09-28
Project:CDFW
Location on 2016-08-12:Bouldin Alfalfa,
Notes:

Documents

Calibration: Hukseflux_NR01_2418.pdf
PackingSlip: ps_Campbell_20150928.pdf

History

Rec No.DateLoc FromTitleLoc ToNotes
2401 2016-08-12 Lab none Installed Bouldin Alfalfa Net Radiometer 4-way Installed with the initial set up of the site.
1971 2015-04-10 Factory Calibration Factory Initial factory calibration:
4 components
Component SWin sn4041 2015-01-30
a0 = 0
a1 = 17.50 uV/(W/m2)
Component SWout sn4042 2015-01-30
a0 = 0
a1 = 19.84 uV/(W/m2)
Component LWin sn3982 2015-02-04
a0 = 0
a1 = 11.38 uV/(W/m2)
Component LWout sn3983 2015-02-04
a0 = 0
a1 = 11.43 uV/(W/m2)