Equipment and Calibration History

History for Hukseflux HFP01 11329

Rec No.DateLoc FromTitleLoc ToNotes
5524 2021-09-09 Lab none Installed Gilbert Tract Heat Flux Plate C Installed at Gilbert Tract at -2cm to the west of the tower
5519 2021-09-02 Sherman Wetland Heat Flux Plate B Removed Lab none Removed from Sherman Wetland with the decommissioning of the site. The aluminum conduit was rotting and needed to be removed.
2299 2016-05-24 Lab none Installed Sherman Wetland Heat Flux Plate B Installed on the Sherman Wetland tower at the initial set up of the site.
1958 2015-06-11 Factory Calibration Factory Initial factory calibration: 61.47 uV/(W/m2)