Equipment and Calibration History
View Equipment |
Date: |
2001-05-20 |
From: |
Lab - none |
To: |
Tonzi - |
Title: |
Installed |
Notes: |
Installed on the Tower top in the reflected PAR location with the initial set up of the site |
Entered by: |
Joe Verfaillie |
|
|
Field notes