Equipment and Calibration History
View Equipment |
Date: |
2017-06-14 |
From: |
Lab - none |
To: |
East End-Temp2 - Multiplexer Thermocouples |
Title: |
Installed |
Notes: |
Installed on the East End Temporary Tower #2 Closed Canpoy location with the initial tower set up. |
Entered by: |
Joe Verfaillie |
|
|