Date: |
2017-06-23 |
From: |
Mayberry - DO Sensor D |
To: |
East End-Temp3 - DO Sensor |
Title: |
Moved |
Notes: |
Removed MiniDOT (from upper position; it was 1 of 2 sensors in upper position) since water level has been really low and we probably decided 2 sensors was probably enough for a profile. Installed it at EE Temp Tower 3. |
Entered by: |
Ada Chang |
|
|