Rec No. | Date | Loc From | Title | Loc To | Notes |
3302 |
2018-01-23 |
Lab none |
Installed |
Mayberry |
Installed at Mayberry to supply extra winter power. |
3178 |
2017-10-19 |
East End-Temp1 Solar Panel B |
Removed |
Lab none |
Removed with decommissioning of East End Open Water tower (temporary tower 1) |
4316 |
2017-06-01 |
Lab none |
Installed |
East End-Temp1 Solar Panel B |
Installed at the East End Temporary Tower #1 Open Water location with the initial set up of this site. |
2773 |
2017-05-18 |
West Pond Solar Panel B |
Removed |
Lab none |
Removed from West Pond to make way for new 24V system. |
580 |
2012-05-02 |
Lab none |
Installed |
West Pond Solar Panel B |
Installed to power the site at West Ponds. The solar panels are on top of one level of scaffolding just inside the edge of the east pond. |