Equipment and Calibration History
History for Kyosera KD140SX-UFBS 11ZV0M0856
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
3302 | 2018-01-23 | Lab none | Installed | Mayberry | Installed at Mayberry to supply extra winter power. |
3178 | 2017-10-19 | East End-Temp1 Solar Panel B | Removed | Lab none | Removed with decommissioning of East End Open Water tower (temporary tower 1) |
4316 | 2017-06-01 | Lab none | Installed | East End-Temp1 Solar Panel B | Installed at the East End Temporary Tower #1 Open Water location with the initial set up of this site. |
2773 | 2017-05-18 | West Pond Solar Panel B | Removed | Lab none | Removed from West Pond to make way for new 24V system. |
580 | 2012-05-02 | Lab none | Installed | West Pond Solar Panel B | Installed to power the site at West Ponds. The solar panels are on top of one level of scaffolding just inside the edge of the east pond. |