Equipment and Calibration History

History for Vaisala HMP45A F1830005

Rec No.DateLoc FromTitleLoc ToNotes
7176 2025-03-26 Lab none Installed Rush Ranch RH & Temp Annex Installed on a Campbell tripod and moved out into the marsh south west of the main tower. Exact location still TBD
7055 2024-12-02 Lab none Tested Lab none Connected to a CR1000 and tested next to the HMP155 from WP for six days. Seems okay. See: https://biometlab.cnr.berkeley.edu/bmetdata/rtreport.php?screen=view&id=86