Equipment history at Tonzi| ALL | | Anemometer || Barometer || Battery Bank || Camera || CO2 Probe || Data Logger || Forced Diffusion || Gas Analyzer || Heat Flux Plate || Infrared Temperature || Interface || LED sensor || Moisture Point || Multiplexer || Narrow Band || Net Radiometer || PAR Sensor || Precipitation || Radio || RH & Temp || Soil Moisture Probe || Soil Water Potential || Solar Controller || Solar Panel || Water Level || Weather Station |
SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date
Date | Serial No. | Model | Action | Ref | Notes |
---|---|---|---|---|---|
Soil Water Potential | |||||
2012-01-09 | 15729 | SX229 | Installed | Installed at -20cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15730 | SX229 | Installed | Installed at -40cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15731 | SX229 | Installed | Installed at -60cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15764 | SX229 | Installed | Installed at -80cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15802 | SX229 | Installed | Installed at -10cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15818 | SX229 | Installed | Installed at -20cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15822 | SX229 | Installed | Installed at -10cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15824 | SX229 | Installed | Installed at -5cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15825 | SX229 | Installed | Installed at -30cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15833 | SX229 | Installed | Installed at -20cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15836 | SX229 | Installed | Installed at -70cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15839 | SX229 | Installed | Installed at -45cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15840 | SX229 | Installed | Installed at -30cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15843 | SX229 | Installed | Installed at -10cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15846 | SX229 | Installed | Installed at -5cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15852 | SX229 | Installed | Installed at -5cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15856 | SX229 | Installed | Installed at -50cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 15942 | SX229 | Installed | Installed at -65cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2022-06-07 | G20007096 | TEROS21 | Installed | Soil Water Potential C | Installed near the OSU-SP1 soil sensors at -10cm, vertical orientation |
2024-05-08 | G20007096 | TEROS21 | Removed | Soil Water Potential C | Removed from the OSU SP1 system at Tonzi for testing. It wasn't giving data. Cows might have damaged its cable. |
2024-05-15 | G20007096 | TEROS21 | Installed | Soil Water Potential C | Reinstalled in close to the original location at about -10cm after repairing the cow chewed cable in the lab |
2022-04-27 | G20007112 | TEROS21 | Installed | Water Potential A | Installed near the drip line of the trees near the Tower Moisture Point probe |
2022-04-27 | G20010035 | TEROS21 | Installed | Soil Water Potential B | Installed near the base of a tree near the Tower Moisture Point Probe |