Equipment and Calibration

Equipment history at Tonzi

| ALL | | Anemometer || Barometer || Battery Bank || Camera || CO2 Probe || Data Logger || Forced Diffusion || Gas Analyzer || Heat Flux Plate || Infrared Temperature || Interface || LED sensor || Moisture Point || Multiplexer || Narrow Band || Net Radiometer || PAR Sensor || Precipitation || Radio || RH & Temp || Soil Moisture Probe || Soil Water Potential || Solar Controller || Solar Panel || Water Level || Weather Station |

SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date

Date Serial No. Model Action Ref Notes
Soil Moisture Probe
2021-03-17 139/052 ML2x Installed Soil Moisture Probe F -0.50m Installed in the same location and depth as the one the died and was previously removed. This probe is buried vertically with its times at 44-50cm. It is at the drip line of the tree to the SE of the data logger box.
2022-06-07 2674 SoilVUE10 Installed Soil Moisture Probe I Profile I installed this probe to the west of the Floor met boxes near the existing Moisture Point probe and soil matrix sensor under the trees. This is SoilVue A in the data.
2022-06-07 2676 SoilVUE10 Installed Soil Moisture Probe H Profile I installed this probe in the open to the south of the Floor met boxes towards the Tower along the existing power conduit. I cut a hole in the conduit and ran the cable back to the Floor CR23x. This is SoilVue B in the data.
2022-06-07 2688 SoilVUE10 Installed Soil Moisture Probe J Profile Installed near the OSU-SP1 soil sensors. This is SoilVue C in the data.
2001-01-05 31/016 ML2x Installed Installed at Tonzi at -25cm under the trees.
2001-01-05 31/033 ML2x Installed Installed near the Tonzi Tower at the surface.
2001-01-05 31/085 ML2x Installed Installed at the Tonzi Tower at -20cm in the open.
2001-01-05 31/092 ML2x Installed Installed near the Tonzi Tower at -20cm in the open.
2001-01-05 31/100 ML2x Installed Installed near the Tonzi Tower at -20cm under the trees.
2024-05-08 31/100 ML2x Removed Soil Moisture Probe B -0.20m Tree Removed from Tonzi because I cut its cable while digging a hole to reinstall a SHF plate. I'm sure this was #2 on the data logger ant the smap entry says tree, but this was about 3m south of the box in a mostly open area. Tines were vertical 16-22cm deep.
2024-05-22 31/100 ML2x Installed Soil Moisture Probe B -0.20m Tree Reinstalled in the original location after being repaired in the lab for cow chew
2001-03-01 54/004 ML2x Installed Installed near the Tonzi Tower at -50cm
2001-03-01 54/009 ML2x Installed Installed near the Tonzi Tower at -50am.
2012-01-09 5TE-1274 STD-5TE Installed Installed at -60cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TE-1275 STD-5TE Installed Installed at -40cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TE-1278 STD-5TE Installed Installed at -2cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TE-1281 STD-5TE Installed Installed at -5cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TE-1287 STD-5TE Installed Installed at -10cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TE-1393 STD-5TE Installed Installed at -20cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TE-1400 STD-5TE Installed Installed at -80cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1282 STD-5TM Installed Installed at -10cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1285 STD-5TM Installed Installed at -5cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1286 STD-5TM Installed Installed at -5cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1296 STD-5TM Installed Installed at -65cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1297 STD-5TM Installed Installed at -45cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1306 STD-5TM Installed Installed at -2cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1308 STD-5TM Installed Installed at -50cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1315 STD-5TM Installed Installed at -10cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1342 STD-5TM Installed Installed at -2cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1388 STD-5TM Installed Installed at -20cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1395 STD-5TM Installed Installed at -30cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1396 STD-5TM Installed Installed at -20cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1405 STD-5TM Installed Installed at -70cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 5TM-1407 STD-5TM Installed Installed at -30cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
Export to BADM