Equipment and Calibration
Equipment history at Tonzi| ALL | | Anemometer || Barometer || Battery Bank || Camera || CO2 Probe || Data Logger || Forced Diffusion || Gas Analyzer || Heat Flux Plate || Infrared Temperature || Interface || LED sensor || Moisture Point || Multiplexer || Narrow Band || Net Radiometer || PAR Sensor || Precipitation || Radio || RH & Temp || Soil Moisture Probe || Soil Water Potential || Solar Controller || Solar Panel || Water Level || Weather Station |
SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date
Date | Serial No. | Model | Action | Ref | Notes |
---|---|---|---|---|---|
Soil Moisture Probe | |||||
2021-03-17 | 139/052 | ML2x | Installed | Soil Moisture Probe F -0.50m | Installed in the same location and depth as the one the died and was previously removed. This probe is buried vertically with its times at 44-50cm. It is at the drip line of the tree to the SE of the data logger box. |
2022-06-07 | 2674 | SoilVUE10 | Installed | Soil Moisture Probe I Profile | I installed this probe to the west of the Floor met boxes near the existing Moisture Point probe and soil matrix sensor under the trees. This is SoilVue A in the data. |
2022-06-07 | 2676 | SoilVUE10 | Installed | Soil Moisture Probe H Profile | I installed this probe in the open to the south of the Floor met boxes towards the Tower along the existing power conduit. I cut a hole in the conduit and ran the cable back to the Floor CR23x. This is SoilVue B in the data. |
2022-06-07 | 2688 | SoilVUE10 | Installed | Soil Moisture Probe J Profile | Installed near the OSU-SP1 soil sensors. This is SoilVue C in the data. |
2001-01-05 | 31/016 | ML2x | Installed | Installed at Tonzi at -25cm under the trees. | |
2001-01-05 | 31/033 | ML2x | Installed | Installed near the Tonzi Tower at the surface. | |
2001-01-05 | 31/085 | ML2x | Installed | Installed at the Tonzi Tower at -20cm in the open. | |
2001-01-05 | 31/092 | ML2x | Installed | Installed near the Tonzi Tower at -20cm in the open. | |
2001-01-05 | 31/100 | ML2x | Installed | Installed near the Tonzi Tower at -20cm under the trees. | |
2024-05-08 | 31/100 | ML2x | Removed | Soil Moisture Probe B -0.20m Tree | Removed from Tonzi because I cut its cable while digging a hole to reinstall a SHF plate. I'm sure this was #2 on the data logger ant the smap entry says tree, but this was about 3m south of the box in a mostly open area. Tines were vertical 16-22cm deep. |
2024-05-22 | 31/100 | ML2x | Installed | Soil Moisture Probe B -0.20m Tree | Reinstalled in the original location after being repaired in the lab for cow chew |
2001-03-01 | 54/004 | ML2x | Installed | Installed near the Tonzi Tower at -50cm | |
2001-03-01 | 54/009 | ML2x | Installed | Installed near the Tonzi Tower at -50am. | |
2012-01-09 | 5TE-1274 | STD-5TE | Installed | Installed at -60cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TE-1275 | STD-5TE | Installed | Installed at -40cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TE-1278 | STD-5TE | Installed | Installed at -2cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TE-1281 | STD-5TE | Installed | Installed at -5cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TE-1287 | STD-5TE | Installed | Installed at -10cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TE-1393 | STD-5TE | Installed | Installed at -20cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TE-1400 | STD-5TE | Installed | Installed at -80cm at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1282 | STD-5TM | Installed | Installed at -10cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1285 | STD-5TM | Installed | Installed at -5cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1286 | STD-5TM | Installed | Installed at -5cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1296 | STD-5TM | Installed | Installed at -65cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1297 | STD-5TM | Installed | Installed at -45cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1306 | STD-5TM | Installed | Installed at -2cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1308 | STD-5TM | Installed | Installed at -50cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1315 | STD-5TM | Installed | Installed at -10cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1342 | STD-5TM | Installed | Installed at -2cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1388 | STD-5TM | Installed | Installed at -20cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1395 | STD-5TM | Installed | Installed at -30cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1396 | STD-5TM | Installed | Installed at -20cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1405 | STD-5TM | Installed | Installed at -70cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. | |
2012-01-09 | 5TM-1407 | STD-5TM | Installed | Installed at -30cm at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. |