Equipment history at Hill Slough| ALL | | Anemometer || Battery Bank || Camera || CO2 Probe || Conductivity Sensor || Data Logger || DO Sensor || Fluorometer || Forced Diffusion || Gas Analyzer || Heat Flux Plate || Interface || Multiplexer || Narrow Band || Net Radiometer || PAR Sensor || pH ORP || Precipitation || Range Finder || RH & Temp || Soil Moisture Probe || Solar Controller || Solar Panel || Water Level || Wiper |
SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date
Date | Serial No. | Model | Action | Ref | Notes |
---|---|---|---|---|---|
Net Radiometer | |||||
2021-06-22 | 121038 | CNR4 | Moved | Moved from HS to WP as part of the radiometer calibration kit at the conclusion of the 2-week intercomparison at HS. | |
2021-03-25 | 2420 | NR01 | Installed | Net Radiometer 4-way | Installed at Hill Slough at the end of the radiation boom. The NR-LITE was moved back along the boom. |
2021-03-11 | 990350 | NR-LITE | Installed | Net Radiometer | Installed at Hill Slough with site setup. Temporary Rnet measurement until we have finished testing the 4-way radiometer. |
2022-03-31 | 990350 | NR-LITE | Removed | Net Radiometer | Removed from HS because we are done comparing the NR01 data to it. Planning to use this sensor for the advection setup this summer. |