Equipment and Calibration

Equipment history at Hill Slough

| ALL | | Anemometer || Battery Bank || Camera || CO2 Probe || Conductivity Sensor || Data Logger || DO Sensor || Fluorometer || Forced Diffusion || Gas Analyzer || Heat Flux Plate || Interface || Multiplexer || Narrow Band || Net Radiometer || PAR Sensor || pH ORP || Precipitation || Range Finder || RH & Temp || Soil Moisture Probe || Solar Controller || Solar Panel || Water Level || Wiper |

SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date

Date Serial No. Model Action Ref Notes
Net Radiometer
2021-06-22 121038 CNR4 Moved Moved from HS to WP as part of the radiometer calibration kit at the conclusion of the 2-week intercomparison at HS.
2021-03-25 2420 NR01 Installed Net Radiometer 4-way Installed at Hill Slough at the end of the radiation boom. The NR-LITE was moved back along the boom.
2021-03-11 990350 NR-LITE Installed Net Radiometer Installed at Hill Slough with site setup. Temporary Rnet measurement until we have finished testing the 4-way radiometer.
2022-03-31 990350 NR-LITE Removed Net Radiometer Removed from HS because we are done comparing the NR01 data to it. Planning to use this sensor for the advection setup this summer.
Export to BADM