Equipment and Calibration History

View Equipment |

View history entry 5222 for Hukseflux NR01 sn: 2420

Date: 2021-03-25
From: Lab - none
To: Hill Slough - Net Radiometer 4-way
Title: Installed
Notes: Installed at Hill Slough at the end of the radiation boom. The NR-LITE was moved back along the boom.
Entered by: Joe Verfaillie
Field notes