Equipment and Calibration

Equipment history at Tonzi

| ALL | | Anemometer || Barometer || Battery Bank || Camera || CO2 Probe || Data Logger || Forced Diffusion || Gas Analyzer || Heat Flux Plate || Infrared Temperature || Interface || LED sensor || Moisture Point || Multiplexer || Narrow Band || Net Radiometer || PAR Sensor || Precipitation || Radio || RH & Temp || Soil Moisture Probe || Soil Water Potential || Solar Controller || Solar Panel || Water Level || Weather Station |

SELECT a.recno, a.eh_date, a.eh_loc1, a.eh_loc2, IF(a.eh_loc2=:loc, a.eh_locref2, a.eh_locref1) AS ref, a.eh_locref2, a.eh_title, a.eh_notes, a.eh_id, b.serialno, b.equip, b.modelno FROM equiphist a INNER JOIN equiplist b ON a.eh_id=b.recno WHERE (a.eh_loc1=:loc1 OR a.eh_loc2=:loc2) AND b.equip=:eq ORDER BY b.serialno, a.eh_date

Date Serial No. Model Action Ref Notes
Data Logger
2013-01-06 12213 CR10X Removed Removed from the non-functional east sap flow station at Tonzi.
2024-10-29 13214 CR10X Installed Data Logger StemFlux East Installed east of the Floor tower to measure tree trunk temperatures for Kuno's stem flux experiment
2016-07-07 19481 CR10X Removed Removed from the Floor soil temperature, SHF, RH&T and Pres. These sensors have been moved to the CR23x collecting soil moisture.
2024-10-29 19481 CR10X Installed Data Logger StemFlux North Installed north of the Floor tower to measure tree trunk temperatures for Kuno's stem flux experiment
2018-03-06 20138 CR10X Removed Removed from Tonzi tower's old CO2 profile system b/c the profile system was not working. It was replaced by sn 47253.
2019-01-13 20138 CR10X Installed Installed near the Floor solar panels to record temperatures from a concrete cal panel for the FLIR thermal camera.
2010-12-09 20139 CR10X Removed This data logger was removed with the IRT sensors from Tonzi.
2010-03-19 20140 CR10X Installed Given to Siyan to install in the supplemental solar radiation measurements near the tram and floor system.
2011-02-03 20140 CR10X Removed Removed from Tonzi Floor. This data logger was recording up and down PAR, net and shf from the open space near the floor solar panels and net, RH and T and shf from under the trees.
2018-02-07 2113 CR6 Installed Installed on Tonzi Tower for the Vaisala GMP CO2 profile.
2022-06-07 2143 CR23X Removed none Disconnected and packed up on 05/26 but brought back to the lab today - no longer needed
2002-06-20 2301 CR23X Installed Data Logger Soil CO2 Installed with the initiation of soil CO2 gradient measurements
2022-10-05 2301 CR23X Removed Data Logger Soil CO2 The soil co2 gradient system has not been in good condition for a long time. Finally getting around to removing the equipment from the field.
2022-11-03 2301 CR23X Installed none Installed with the IRT sensor sn 7385 from the cal panel near the Floor solar panels for an IRT calibration for Robert's Oakley bike transect data this past summer
2022-11-17 2301 CR23X Removed none Removed from Tonzi at the conclusion of the IRT calibration along with IRT sensor sn 7385
2010-03-16 25799 CR10X Installed This data logger was installed with new supplemental radiation and air temperature sensor inside the floor cow fense. Problems getting final storage data dumped - will have it swapped out by next visitor.
2010-03-21 25799 CR10X Removed This data logger was swapped out by Siyan from the floor supplemental radiation and temperature system. Final storage data is corrupt.
2013-10-18 31308 CR10X Removed The tram derailed at the far end of the track not stopping and reversing direction. Initially it reset okay moving to park, but it did not run on the hour. The data was corrupt, but I was able to upload programs and a new OS in the field. It still would not run. I brought it in for fixing.
2024-10-29 3501 CR10X Installed Data Logger StemFlux West Installed west of the Floor tower to measure tree trunk temperatures for Kuno's stem flux experiment
2010-02-10 38347 CR10X Removed This data logger was removed from Tonzi. It was used for sap flow just west of the floor tower. AM416 sn 14049 was removed with it. Wiring panel is 28250.
2012-01-09 38970 CR3000 Installed Installed in the Campbell Enclosure at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2023-06-16 4190 CR1000 Installed none Installed at the tower top as part of the Arduino RSB diffuse PAR prototype to compare with the BF5
2023-07-06 4190 CR1000 Removed Removed from the Tower Top where it was part of the Arduino based RSB diffuse PAR prototype
2012-01-09 41907 CR1000 Installed Installed in the Campbell Enclosure at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2012-01-09 41909 CR1000 Installed Installed in the Campbell Enclosure at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.
2018-03-06 47253 CR10X Installed Installed at Tonzi to try to fix the CR10x running the tower's old CO2 profile system. It replaced sn 20138.
2018-05-23 47253 CR10X Removed Removed from the Tonzi Tower with the old CO2 profile system. New Vaisala profile system is running
2016-10-13 47772 CR10X Removed Removed from the non-functioning sap flow station north of the road
2019-04-16 47772 CR10X Removed Removed with the wooden cal panel for the FLIR because cows chewed the TC wires and the new cal panel is better
2019-05-30 47772 CR10X Installed Installed near an oak tree about 25m north of the Floor solar panels to support two IRTs
2022-06-07 47772 CR10X Removed Disconnected and packed up on 05/26 but brought back to the lab today - no longer needed
2016-10-13 48042 CR10X Removed Removed from the non-functioning sap flow station within the Tower cow fence
2015-05-06 66249 CR1000 Installed Data Logger IRT Installed at Tonzi to the east just north of the road. This data logger is collecting data from the two IRT sensors
2020-03-02 66249 CR1000 Maintenance Data Logger IRT I changed this data logger Pakbus id from 1 to 49 - the last two digits of its serial number.
2024-04-22 66249 CR1000 Removed Data Logger IRT Removed from the IRT tripod because cows had chewed the wires off.
2024-06-04 66249 CR1000 Installed Data Logger IRT Reinstalled at the little tree northeast of the Tower at Tonzi after having been removed to repair massive cable damage from cows
2015-04-08 66250 CR1000 Installed Installed with the Handar wind profile near the Floor tower.
2015-12-23 66250 CR1000 Removed Removed from the box for the wind profile near the Floor tower.