Documents

Full list | Available Documents:
Real Time Reports | Calibration | Data | Manual | Other | PackingSlip | RMA
| BA | BC | DC | EE | EL | EP | GT | HS | MB | RR | SB | SI | SW | TA | TW | TZ | VR | WP |

Processing Notes Wikis - via BitBucket

Eddy Processing Notes
Met Processing Notes

Real Time Reports

namelast updatesize
Delta SW PAR Comparison 10-2016 2017-05-08 5714
East End - NDVI (SRS, Apogee, Planet) 2017-06-07 7818
East End - Radiometer Calibration 2021 2021-07-21 8770
EE Picam Intercomparison 2024-05-02 9423
HMP RH and AirT Comparison 12-2017 2017-12-18 8860
Picam FWB Rescaling - EE 2022-02-18 10701
Water Level sensor calibration with staff gauge 2018-04-24 10480

Other

IDTypeDatefile nameDescription
100 Report EastEndProjectInfo.pdf
173 Report 2015-05-29 2015_EE_AmerifluxReport.pdf Ameriflux intercomparison from May 29 - June 9, 2015 at East End