Back to site list

Site: Hill Slough (HS) aka US-Hsm

2021-03-11 - Present

Marking the new tower site
More photos
The site is currently a diked marsh - upland ecotone located at the northern Suisun Marsh. It will undergo tidal restoration in Fall 2021. Restoration work is done by Ducks Unlimited Inc. and will cover an area of 649 acres. After levee breaches, the site tower will be in a high marsh system. Water level at high tide is estimated to be 0.5-1 m above the soil. Ducks Unlimited, Inc. and the Berkeley Biometeorology lab are working together to evaluate the effects of the proposed tidal marsh restoration project.

Ameriflux BADM Site Info

Last field site visit: more fieldnotes

2024-11-19 16:10:00 Regular data collection/cleaning, unusually still, high tide

Latest data processing: more processing notes

2024-07-12 Hillslough Processing for dates: 2023-11-20 - 2024-04-21

Processor of record:
2021-06-07 - Ariane Arias-Ortiz
2023-06-22 - Kyle Delwiche
2024-06-11 - Daphne Szutu
2024-07-12 - Kyle Delwiche
Ameriflux Author:
20210311 - Ariane Arias-Ortiz
20210311 - Daphne Szutu
20210311 - Joseph Verfaillie
20210311 - Dennis Baldocchi

Data Digital Object Identifier (DOI)
AmeriFlux: https://doi.org/10.17190/AMF/1890483


Equipment Locations more details

EquipmentStart DateEnd DateXYZNotes
Anemometer 2021-03-11 2021-05-26 0 0 5.51 Heading=3 deg true N
2021-05-26 - 0 0 5.51 Heading=10 deg true N
Battery Bank 2021-03-11 -
Camera 2021-03-11 - 0.08 -1.96 4.08
CO2 Probe 2021-03-11 2022-08-24 Main Tower
CO2 probe 2022-08-24 - Channel
Conductivity Sensor 2023-05-09 -
Data Logger Diffuse 2021-04-27 -
Data Logger Met 2021-03-11 - 0.08 -1.96 3.14
DO Sensor 2021-11-04 - 0.1
fDOM 2022-07-13 - EXO2 sensor
Forced Diffusion A 2021-03-25 - -1.57 -4.15 0
Gas Analyzer CH4 2021-03-11 - 0.08 0.17 5.44
Gas Analyzer CO2/H2O 2021-03-11 - -0.12 0.27 5.51
Heat Flux Plate A 2021-03-11 - -3.47 -6.05 -0.02
Heat Flux Plate B 2021-03-11 - 0.74 -8.09 -0.02
Interface EXO 2022-07-13 - channel
Interface LI-7550 2021-03-11 - 0.08 0.07 3.14
Multiplexer Met 2021-03-11 - 0.08 -1.96 2.94
Multiplexer Thermocouple 2021-03-11 - 0.08 -1.96 3.04
Narrow Band NDVI Incoming 2021-03-11 - 0.13 -4.48 4.68
Narrow Band NDVI Reflected 2021-03-11 - 0.13 -4.38 4.68
Net Radiometer 2021-03-11 2021-03-25 0.08 -5.19 4.68 At end of boom
2021-03-25 - 0.03 -4.56 4.68 Moved to make room for 4-way
Net Radiometer 4-way 2021-03-25 - 0.08 -4.79 4.68 At end of boom
PAR Sensor Diffuse 2021-04-27 -
PAR Sensor Incoming 2021-03-11 - 0.13 -4.63 4.74
PAR Sensor Incoming Cal 2021-06-09 2021-06-16
PAR Sensor Reflected 2021-03-11 - 0.13 -4.63 4.62
PAR Sensor Reflected Cal 2021-06-16 2021-06-22
pH-ORP 2022-07-13 - EXO2 sensor
Precipitation 2021-03-16 - 1.8 -2.16 4.59
RH & Temp 2021-03-11 - -0.25 0.17 5.04
Soil Moisture Probe A 2021-03-11 - -3.75 -7.15 -0.08
Soil Moisture Probe B 2021-03-11 - 0.56 -7.67 -0.08
Solar Controller 2021-03-11 -
Solar Panel A 2021-02-26 -
2021-02-26 - 1.88 23.36 5
Solar Panel B 2021-02-26 -
2021-02-26 - 1.88 22.61 4.5
Solar Panel C 2021-02-26 -
2021-02-26 - 1.88 21.86 4
Thermocouple A Profile 2021-03-11 - -0.93 -5.03 0.32
2021-03-11 - -0.93 -5.03 0.08
2021-03-11 - -0.93 -5.03 0
2021-03-11 - -0.93 -5.03 -0.02
2021-03-11 - -0.93 -5.03 -0.04
2021-03-11 - -0.93 -5.03 -0.08
2021-03-11 - -0.93 -5.03 -0.16
2021-03-11 - -0.93 -5.03 -0.32
Thermocouple B Profile 2021-03-11 - 1.16 -7.67 0.32
2021-03-11 - 1.16 -7.67 0.08
2021-03-11 - 1.16 -7.67 0
2021-03-11 - 1.16 -7.67 -0.02
2021-03-11 - 1.16 -7.67 -0.04
2021-03-11 - 1.16 -7.67 -0.08
2021-03-11 - 1.16 -7.67 -0.16
2021-03-11 - 1.16 -7.67 -0.32
Thermocouple C Profile 2021-03-11 - -4.1 -6.82 0.32
2021-03-11 - -4.1 -6.82 0.08
2021-03-11 - -4.1 -6.82 0
2021-03-11 - -4.1 -6.82 -0.02
2021-03-11 - -4.1 -6.82 -0.04
2021-03-11 - -4.1 -6.82 -0.08
2021-03-11 - -4.1 -6.82 -0.16
2021-03-11 - -4.1 -6.82 -0.32
Turbidity 2022-07-13 - EXO2 sensor
Water Level 2021-03-11 2022-08-24 0.28 -3.4 -1.05 Main Tower
2022-08-24 - Channel
Wiper EXO 2022-07-13 - Central wiper for EXO

Data Streams: more data

CodeFirst DayLast DayDescription
HS_cam 2021-03-11 - Digital number data from Raspberry Pi camera at Hill Slough Phenocam archive
HS_fd 2021-03-25 2021-10-26 Soil CO2 flux from an Eosense Forced Diffusion Chamber
HS_flux 2021-03-11 - 30min averages of the raw high frequency eddy data from the Hill Slough tower
HS_met 2021-03-11 - Micromet data from the Hill Slough site recorded by a CR1000 as 30min averages of 10sec samples.
HS_minidot 2021-11-04 - Dissolved oxygen data from the PME minidot sensor
HS_nwisfmb 2021-03-11 - Data from USGS 381142122015801 FIRST MALLARD BRANCH NR FAIRFIELD CA by web service: https://waterservices.usgs.gov/rest/IV-Test-Tool.html
HS_processed 2021-03-11 - Processed data equivalent to L1, L2, L3 and Ameriflux outputs from the Matlab processing.
HS_processed3 2021-03-11 - Gap filling and partitioned data from Level 3 processing

Metadata and Data Sets: more data

IdTypeSiteDates FrequencyTitle Description
38 Soils HS 2021-07-07 - 2021-07-08 Once Preflood base line sampling 2021-07-07 to 2021-07-08. Soil cores were collected from nine locations at Hill Slough. At each location, three short cores (up to 30 cm) and one long core (up to 60-99 cm) were collected. Two of the short cores were cut into approximately 2.5 cm sections, and one at 1 cm thick intervals in the lab. Long cores were sliced at 5 cm intervals in the field. Soil samples were analyzed for delta13C, delta15N, C, N, and organic matter content. Additionally, at locations 1, 2, and 4, soils were analyzed for Pb-210. Scott Jones from USGS conducted vegetation and RTK-GPS (Real Time Kinematics with centimeter resolution) measurements for the sample locations and additional points in between sample locations on 2021-07-20.

Regarding the post-fixes on the sample names: N denotes North, E = East, S = South, and L = Long. The long core at each plot was collected at the center of the triangle formed by N, E, and S (with approximately 2 meters distance between cores). Due to a shortage of acrylic short tubes, from site 5 to 9, we collected N, E, and L cores.
40 Soils HS 2024-06-12 - 2024-06-26 Once Postflood sampling Soil cores were collected from eight locations at Hill Slough, redoing the same locations as preflood sampling in 2021. HSM_1, 2, 3, 4, 6, 7, 8, 9 were sampled. We skipped HSM_5 because it was mostly levee construction soil, not wetland soil. At each location, three short cores (up to 30 cm) were collected. Two of the short cores were cut into approximately 2.5 cm sections, and one at 1 cm thick intervals in the lab. Soil samples will be analyzed for delta13C, delta15N, C, N, and organic matter content. Some soils will also be analyzed for Pb-210.
Documents:
https://youtu.be/0bVRl3FYKg4 - Time lapse from October 1 - 26, 2021 of Hill Slough breach flood up.
https://youtu.be/QRUPnIia8sA - Times lapse of tides at HS 1 sec = 2 hours
Hill Slough - Radiometer Calibration 2021
test cal kit report
Picam FWB Rescaling - HS