Title: | East End - Radiometer Calibration 2021 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Date: | 2021-07-21 - 2021-08-17 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Data File: | EE_calkit_20210817.csv EE_calNDVI_20210817.csv |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Refers to: | EE,121038,060831,1049,1050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
From 2021-06-22 to 2021-07-21 we set up the radiometer calibration kit at West Pond. We set up all the calibration sensors on the radiometer boom. Unfortunately I didn't take any photos of the setup. The calibration sensors were a 4-way radiometer, a PAR sensor, and a pair of Apogee NDVI sensors. The PAR sensor was initially installed facing up to measure incoming light. Halfway through the calibration on 2021-07-06, we turned the PAR sensor so it faced downward and measured reflected radiation.
Â
Â
 Shortwave Incoming Figure 1. Incoming shortwave radiation.
Figure 2. Linear regression between tower and reference sensors. Â Shortwave Outgoing Figure 3. Outgoing shortwave radiation.
Figure 4. Linear regression between tower and reference sensors. Â Longwave Incoming Figure 5. Incoming longwave radiation.
Figure 6. Linear regression between tower and reference sensors.  Longwave Outgoing Figure 7. Outgoing longwave radiation.
Figure 8. Linear regression between tower and reference sensors. Â Incoming PAR Figure 9. Incoming PAR from the reference sensor and 2 tower sensors (PARin sensor and rotating shadowband (RSB) sensor used to measure diffuse PAR).
Figure 10. Linear regression between tower and reference sensors. Measurements <1mV were discarded to avoid too much weight on nighttime values. Â Outgoing PAR Figure 11. Outgoing PAR.
Figure 12. Linear regression between tower and reference sensors. Measurements <0.2mV were discarded to avoid too much weight on nighttime values. Â NDVI Figure 13. NDVI from tower and reference sensors.
Figure 14. Linear regression between tower and reference sensors. Figure 15. Red reflectance. Figure 16. NIR reflectance. Â |
|