Biomet Gallery
All Photos | Site Cam Gallery | Key words
Large Photos
Page: [1]
ID | Name | Location | Date | Size | Camera | Thumb |
---|---|---|---|---|---|---|
1541 | DSCN0813.JPG Bright dead grasses which increase surface albedo |
Vaira | 2007-08-31 17:38:41 | 2048x1536 | COOLPIX L5 | |
1598 | DSCN1865.JPG From the top of tower. A lot of evergreen trees, which should be transpire |
Tonzi | 2007-12-21 13:00:52 | 2048x1536 | COOLPIX L5 | |
4653 | 20170301TA_PestSoldier.jpg We installed a Pest Soldier, which is an ultrasonic and sonic device designed to keep pests away. We set it on the "rodent" setting to discourage ground squirrels from burrowing by our scaffolding. |
Twitchell Alfalfa | 2017-03-01 00:00:00 | 480x640 | iPhone SE | ![]() |
4645 | 20170315BA_newmountfor7500.jpg We installed a new mount for the Li-7500 which is slightly diagonal, and not exactly vertical. |
Bouldin Alfalfa | 2017-03-15 00:00:00 | 810x1440 | unknown | ![]() |
4971 | 20190118WP_CameraFan.jpg Fan in camera enclosure to try to prevent condensation on enclosure window, which has been obscuring the camera's view. |
West Pond | 2019-01-18 00:00:00 | 1080x1440 | unknown | ![]() |
5298 | 20200730MB_MuckyFluorometer.jpg Muck on outside of fluorometer, most of which I could wipe off. The inside was mucky, too, but I couldn't reach it. |
Mayberry | 2020-07-30 12:13:05 | 1440x1920 | iPhone SE (1st generation) | ![]() |
5570 | 20210804HS_Staffgauge.jpg New staff gauge probably installed by CDFW by the Hill Slough enclosure. The bottom of the staff gauge is at 4', which is our approximate elevation asl. |
Hill Slough | 2021-08-04 07:55:04 | 1440x1920 | iPhone SE (1st generation) | ![]() |
5569 | 20210804SW_ChewedCattail.jpg Caterpillars have chewed up this patch of cattail which are now much shorter compared to the tules |
Sherman Wetland | 2021-08-04 17:09:58 | 1920x1440 | iPhone SE (1st generation) | ![]() |
6070 | 20220804HS_ExoScreen1.jpg EXO screenshot showing full battery and suspicious "Next sample time." Sonde time is 15:25 so the next sample time should be 15:26. However, "Next Sample Time" is stuck on "8/4/2022 14:50:00" which is the first sample time of the deployment. |
Hill Slough | 2022-08-04 16:25:32 | 1920x1440 | iPhone 13 Pro | ![]() |
6272 | 20230313BA_LicorET.jpg Licor set up a prototype ET sensor for testing along our regular flux sensors. Their prototype is a 1-D sonic + closed path H2O sensor which produces 30-min ET values. |
Bouldin Alfalfa | 2023-03-13 13:23:52 | 1920x1440 | iPhone SE (1st generation) | ![]() |
6754 | 20240625HS_Robert.jpg Robert modeling our newest waders which already have a broken clip |
Hill Slough | 2024-06-25 14:45:37 | 1920x1440 | iPhone 14 Pro | ![]() |
6839 | 20241105EE_OldMetBox.jpg Enclosure on the bottom layer of scaffolding. Previously had the CR1000 and AM16/32 mux as well, which were moved to the new enclosure on the second layer of scaffolding. Two SHF plates are wired to the new enclosure through the white screw terminal. The AM25T has a long wire connecting it to the CR1000 in the new enclosure. I left the old power strip there for extra parts. |
East End | 2024-11-05 15:57:39 | 1440x1920 | iPhone 8 | ![]() |