Biomet Gallery
All Photos | Site Cam Gallery | Key words
Large Photos
Page: [1]
ID | Name | Location | Date | Size | Camera | Thumb |
---|---|---|---|---|---|---|
5048 | 20190514TZ_JoePressurebomb.JPG Joe taking plant water potential measurements using the pressure bomb. |
Tonzi | 2019-05-14 13:27:37 | 1080x1440 | iPhone SE | |
5774 | 20211123SW_PistonCorer.jpg Carlos and Robert sampling a soil core at the hotspot location using the piston coring settup |
Sherman Wetland | 2021-11-23 15:38:14 | 1440x1920 | iPhone SE (1st generation) | |
5836 | 20220412TZ_KeenanLabSIF.jpg Trevor Keenan's lab using a SIF camera |
Tonzi | 2022-04-12 13:49:37 | 1920x1440 | iPhone 12 Pro | |
6106 | 20221109GT_syringe_sampling.jpg Carlos is sampling at the center of the channel using a syringe-stopcock-tubing assembly |
Gilbert Tract | 2022-11-09 07:04:55 | 1920x1440 | iPhone SE (1st generation) | |
6332 | 20230906MB_KyleBubbles.jpg Kyle collecting sediment gas samples using a plastic tub |
Mayberry | 2023-09-06 11:45:56 | 1440x1920 | iPhone 8 | |
6388 | 20240118HS_Arman.jpg Arman using the telescoping scrubber to clean the staff gauge by the Hill Slough channel |
Hill Slough | 2024-01-18 17:13:45 | 1920x1440 | iPhone 8 | |
6401 | 20240212GT_HackTurnbuckle.jpg When the turnbuckle broke during the previous site visit, we created tension between the chain and the fence post using a long u-bolt and a carabiner |
Gilbert Tract | 2024-02-12 10:13:29 | 1440x1920 | iPhone 8 | |
6696 | 20240228GT_AdcpBox.jpg Using a well pipe to temporarily protect the ADCP cable because it's been cut twice in the last month. We will put it in metal conduit next time. |
Gilbert Tract | 2024-02-28 11:29:43 | 1440x1920 | iPhone 8 |