Biomet Gallery

All Photos | Site Cam Gallery | Key words

Large Photos
Page: [1]

IDNameLocationDateSizeCameraThumb
1698 20091006TW_MovedBackFromEdge1.jpg
Twitchell Rice2009-10-06 14:47:05 2048x1536 Canon PowerShot S1 IS  Moved Back From Edge 1
1699 20091006TW_MovedBackFromEdge2.jpg
Twitchell Rice2009-10-06 14:47:58 2048x1536 Canon PowerShot S1 IS  Moved Back From Edge 2
1237 MB_autocam_20110422_1215.jpg
Joe on site - camera view moved
Mayberry2011-04-22 12:15:02 3648x2736 Canon PowerShot A480 Joe on site - camera view moved
3886 MB_autocam_20140313_1215.jpg
Tule tower moved
Mayberry2014-03-13 12:15:02 1920x1440 Canon PowerShot A480 Tule tower moved
3898 20140403MB_OpenWaterRad.jpg
Open water radiometers moved
Mayberry2014-04-03 10:09:10 1920x1440 Open water radiometers moved
4335 TW_autocam_20150911_0945.jpg
Moved the tower
Twitchell Rice2015-09-11 09:45:01 1920x1440 Canon PowerShot A800 Moved the tower
4430 20160413TW_TowerMoved_tn.jpg
Twitchell Rice2016-04-13 15:33:41 1920x1440 COOLPIX S9100  Tower Moved_tn
4609 20161207TA_TowerMoved.jpg
Twitchell Alfalfa2016-10-26 14:58:24 1920x1440 iPhone SE  Tower Moved
4706 20170703EE_TT1-1.jpg
Moved East End Temp Tower 1 (Open Water) from levee to open water.
East End2017-07-03 14:16:12 1920x1080 SGH-I337M Moved East End Temp Tower 1 (Open Water) from levee to open water.
4707 20170703EE_TT1-2.jpg
Moved East End Temp Tower 1 (Open Water) from levee to open water.
East End2017-07-03 14:16:19 1920x1080 SGH-I337M Moved East End Temp Tower 1 (Open Water) from levee to open water.
5059 20190620BC_GrowingCorn.jpg
We moved the tower about 2m to the west so that the legs were on the edge of the first corn row. The corn was planted about 3-4 weeks ago on 2019-05-25.
Bouldin Corn2019-06-20 12:12:31 1920x1080 SM-G530P We moved the tower about 2m to the west so that the legs were on the edge of the first corn row. The corn was planted about 3-4 weeks ago on 2019-05-25.
5100 20191031MB_WindDamage.jpg
The winds blew away the tower board and moved the boom with the water
Mayberry2019-10-31 00:00:00 1920x1440 SM-G530P The winds blew away the tower board and moved the boom with the water
5316 20200901BC_TowerMove.jpg
Moved the tower back 3-4m before harvest. It's getting crowded underneath the tower with all the soil sensors and forced diffusion chambers.
Bouldin Corn2020-09-01 13:37:48 1920x1573 iPhone SE (1st generation) Moved the tower back 3-4m before harvest. It
5504 20210311HS_ScaffoldFeet.jpg
We moved a 2x12 plank from the edge of the platform to the middle so that we had more area to secure the scaffolding foot. The feet were drilled into the platforms and the scaffolding was tied down with a chain and turnbuckle attached to an eyebolt screwed into the platform (not pictured). The holes in the platform were later covered by chain link fencing.
Hill Slough2021-03-11 12:37:06 1920x1440 iPhone SE (2nd generation) We moved a 2x12 plank from the edge of the platform to the middle so that we had more area to secure the scaffolding foot. The feet were drilled into the platforms and the scaffolding was tied down with a chain and turnbuckle attached to an eyebolt screwed into the platform (not pictured). The holes in the platform were later covered by chain link fencing.
Page: [1]