Biomet Gallery

All Photos | Site Cam Gallery | Key words

Large Photos
Page: [1]

IDNameLocationDateSizeCameraThumb
5504 20210311HS_ScaffoldFeet.jpg
We moved a 2x12 plank from the edge of the platform to the middle so that we had more area to secure the scaffolding foot. The feet were drilled into the platforms and the scaffolding was tied down with a chain and turnbuckle attached to an eyebolt screwed into the platform (not pictured). The holes in the platform were later covered by chain link fencing.
Hill Slough2021-03-11 12:37:06 1920x1440 iPhone SE (2nd generation) We moved a 2x12 plank from the edge of the platform to the middle so that we had more area to secure the scaffolding foot. The feet were drilled into the platforms and the scaffolding was tied down with a chain and turnbuckle attached to an eyebolt screwed into the platform (not pictured). The holes in the platform were later covered by chain link fencing.
5812 20220203BC_FloodedField.jpg
Flood field that is slowly draining. It's about ankle-deep at the tower but Tyler said it was much deeper in the middle of the field.
Bouldin Corn2022-02-03 10:50:36 1920x1440 iPhone 13 Pro Flood field that is slowly draining. It
Page: [1]