Biomet Gallery

All Photos | Site Cam Gallery | Key words

Large Photos
Page: [1]

IDNameLocationDateSizeCameraThumb
4877 20180711SW_KyleTuleRelocation.jpg
Kyle relocating some tules closer to the tower for future isotope chamber work.
Sherman Wetland2018-07-11 13:14:54 1440x1920 iPhone SE Kyle relocating some tules closer to the tower for future isotope chamber work.
5331 20201112HS_CurrentUpland.jpg
Panoramic of current upload ecosystem at future Hill Slough site. Levee breach planned for Aug-Nov 2021.
Hill Slough2020-11-12 08:12:05 1920x1039 iPhone SE (1st generation) Panoramic of current upload ecosystem at future Hill Slough site. Levee breach planned for Aug-Nov 2021.
5744 20211007GT_DegradedBerm.jpg
Degraded access berm has wet spots (future mud pits)
Gilbert Tract2021-10-07 09:06:35 1920x1440 iPhone SE (1st generation) Degraded access berm has wet spots (future mud pits)
Page: [1]