Biomet Gallery

All Photos | Site Cam Gallery | Key words

Large Photos
Page: [1]

IDNameLocationDateSizeCameraThumb
4856 20180307WP_scaffoldjack.JPG
Joe leveling the WP scaffolding by jacking up the tower, attaching new legs onto the tower, and positioning concrete pier blocks under the water.
West Pond2018-03-07 13:47:15 1080x1440 iPhone 5s Joe leveling the WP scaffolding by jacking up the tower, attaching new legs onto the tower, and positioning concrete pier blocks under the water.
4965 20190113TZ_NewFLIRCalPanel.jpg
New cal panel for the FLIR camera made from concrete (wonder) board.
Tonzi2019-01-13 10:15:03 1280x960 unknown New cal panel for the FLIR camera made from concrete (wonder) board.
6047 20220520GT_RevampAdcp.jpg
Daphne, Ari, Joe improving the ADCP setup. We laid down three 3'x5' concrete boards along the bottom of the channel to suppress weed growth. We also shifted the track slightly so that it was more perpendicular to the channel.
Gilbert Tract2022-05-20 13:35:59 1440x1920 iPhone 6s Daphne, Ari, Joe improving the ADCP setup. We laid down three 3
Page: [1]