Biomet Gallery

All Photos | Site Cam Gallery | Key words

Large Photos
Page: [1]

IDNameLocationDateSizeCameraThumb
4856 20180307WP_scaffoldjack.JPG
Joe leveling the WP scaffolding by jacking up the tower, attaching new legs onto the tower, and positioning concrete pier blocks under the water.
West Pond2018-03-07 13:47:15 1080x1440 iPhone 5s Joe leveling the WP scaffolding by jacking up the tower, attaching new legs onto the tower, and positioning concrete pier blocks under the water.
6296 20230509HS_StaffGauge.jpg
Installed a second staff gauge in the channel to let us read water level during low tide when our primary staff gauge by the tower is high and dry. I had to scrape off a bunch of barnacles before attaching the gauge to the post.
Hill Slough2023-05-09 15:44:06 1440x1920 iPhone SE (1st generation) Installed a second staff gauge in the channel to let us read water level during low tide when our primary staff gauge by the tower is high and dry. I had to scrape off a bunch of barnacles before attaching the gauge to the post.
6387 20240118GT_Minidot.jpg
Attaching the miniDOT on the back of the ADCP mount
Gilbert Tract2024-01-18 11:34:00 1440x1920 iPhone 8 Attaching the miniDOT on the back of the ADCP mount
Page: [1]