Biomet Gallery
All Photos | Site Cam Gallery | Key words
Large Photos
Page: [1]
ID | Name | Location | Date | Size | Camera | Thumb |
---|---|---|---|---|---|---|
4856 | 20180307WP_scaffoldjack.JPG Joe leveling the WP scaffolding by jacking up the tower, attaching new legs onto the tower, and positioning concrete pier blocks under the water. |
West Pond | 2018-03-07 13:47:15 | 1080x1440 | iPhone 5s | |
6296 | 20230509HS_StaffGauge.jpg Installed a second staff gauge in the channel to let us read water level during low tide when our primary staff gauge by the tower is high and dry. I had to scrape off a bunch of barnacles before attaching the gauge to the post. |
Hill Slough | 2023-05-09 15:44:06 | 1440x1920 | iPhone SE (1st generation) | |
6387 | 20240118GT_Minidot.jpg Attaching the miniDOT on the back of the ADCP mount |
Gilbert Tract | 2024-01-18 11:34:00 | 1440x1920 | iPhone 8 |