Biomet Gallery
All Photos | Site Cam Gallery | Key words
Large Photos
Page: [1]
ID | Name | Location | Date | Size | Camera | Thumb |
---|---|---|---|---|---|---|
5504 | 20210311HS_ScaffoldFeet.jpg We moved a 2x12 plank from the edge of the platform to the middle so that we had more area to secure the scaffolding foot. The feet were drilled into the platforms and the scaffolding was tied down with a chain and turnbuckle attached to an eyebolt screwed into the platform (not pictured). The holes in the platform were later covered by chain link fencing. |
Hill Slough | 2021-03-11 12:37:06 | 1920x1440 | iPhone SE (2nd generation) | |
6083 | 20220824GT_WaterSensors.jpg Three water sensors (eosGP, CTD, Campbell conductivity) attached to a fence post in a slightly deeper part of the wetland. The slight disturbance in the azolla on the surface indicates where I waded around to find the deepest point of this pond. |
Gilbert Tract | 2022-08-24 12:25:55 | 1440x1920 | iPhone SE (1st generation) | |
6271 | 20230302GT_TeabagAfter.jpg Sole retrieved teabag from the batch installed in May 2022. This was attached to a white PVC pole on the north side of the boardwalk, about 3m from the shore. Multiple roots were growing into the teabag. |
Gilbert Tract | 2023-03-02 17:34:39 | 1440x1920 | iPhone SE (1st generation) |