Biomet Gallery

All Photos | Site Cam Gallery | Key words

Large Photos
Page: [1]

IDNameLocationDateSizeCameraThumb
6971 20250129GT_ChannelEnclosure.jpg
Reorganized the GT channel enclosure. Rotated the ADCP interface to prevent condensation from the ceiling dripping down into the power plug. Also made space in the middle for the EXO DCP signal output adapter.
Gilbert Tract2025-01-29 12:52:26 1440x1920 iPhone 8 Reorganized the GT channel enclosure. Rotated the ADCP interface to prevent condensation from the ceiling dripping down into the power plug. Also made space in the middle for the EXO DCP signal output adapter.
6972 20250130BA_ArmanDennis.jpg
Arman and Dennis on site in the wheat field. The new LI-720 is installed on the northwestern scaffolding post.
Bouldin Alfalfa2025-01-30 13:45:02 1920x1440 iPhone 8 Arman and Dennis on site in the wheat field. The new LI-720 is installed on the northwestern scaffolding post.
6973 20250130BA_Li720.jpg
The new LI-720 is installed on the northwestern scaffolding post over our wheat field (Bouldin Alfalfa site)
Bouldin Alfalfa2025-01-30 14:00:20 1440x1920 iPhone 8 The new LI-720 is installed on the northwestern scaffolding post over our wheat field (Bouldin Alfalfa site)
6974 20250130BA_LicorEnclosure.jpg
Removed Sutron datalogger and installed our own CR6 datalogger to measure the prototype LI-720.
Bouldin Alfalfa2025-01-30 14:00:35 1440x1920 iPhone 8 Removed Sutron datalogger and installed our own CR6 datalogger to measure the prototype LI-720.
Page: [1]