Biomet Gallery
All Photos | Site Cam Gallery | Key words
Large Photos
Page: [1]
ID | Name | Location | Date | Size | Camera | Thumb |
---|---|---|---|---|---|---|
6971 | 20250129GT_ChannelEnclosure.jpg Reorganized the GT channel enclosure. Rotated the ADCP interface to prevent condensation from the ceiling dripping down into the power plug. Also made space in the middle for the EXO DCP signal output adapter. |
Gilbert Tract | 2025-01-29 12:52:26 | 1440x1920 | iPhone 8 | ![]() |
6972 | 20250130BA_ArmanDennis.jpg Arman and Dennis on site in the wheat field. The new LI-720 is installed on the northwestern scaffolding post. |
Bouldin Alfalfa | 2025-01-30 13:45:02 | 1920x1440 | iPhone 8 | ![]() |
6973 | 20250130BA_Li720.jpg The new LI-720 is installed on the northwestern scaffolding post over our wheat field (Bouldin Alfalfa site) |
Bouldin Alfalfa | 2025-01-30 14:00:20 | 1440x1920 | iPhone 8 | ![]() |
6974 | 20250130BA_LicorEnclosure.jpg Removed Sutron datalogger and installed our own CR6 datalogger to measure the prototype LI-720. |
Bouldin Alfalfa | 2025-01-30 14:00:35 | 1440x1920 | iPhone 8 | ![]() |