Biomet Gallery
All Photos | Site Cam Gallery | Key words
Large Photos
Page: [1]
ID | Name | Location | Date | Size | Camera | Thumb |
---|---|---|---|---|---|---|
5331 | 20201112HS_CurrentUpland.jpg Panoramic of current upload ecosystem at future Hill Slough site. Levee breach planned for Aug-Nov 2021. |
Hill Slough | 2020-11-12 08:12:05 | 1920x1039 | iPhone SE (1st generation) | |
6738 | 20240612HS_IreneDaphneArman.jpg Irene, Daphne and Arman take soil sample at HSM_9 the upland location |
Hill Slough | 2024-06-12 10:23:08 | 1920x1440 | iPhone SE (2nd generation) | |
6757 | 20240625HS_Upland.jpg Irene and Robert walking into the upland section at the north end of Hill Slough marsh. We are trying to relocate HSM_9 to take its GPS point. |
Hill Slough | 2024-06-25 14:28:56 | 1920x1440 | iPhone 14 Pro |