Biomet Gallery

All Photos | Site Cam Gallery | Key words

View Details
Page: [1]
JPL equipment just visible on the Tower above the second from top solar panel
4951 20181107TZ_JPLEquipOnTower.jpg (2018-11-07 11:58:46 ) Full size: 1920x1598
JPL equipment just visible on the Tower above the second from top solar panel

Finished setup for second CH4 release experiement
5079 20190816BA_CH4Experiement.jpg (2019-08-16 12:12:16 ) Full size: 1920x1440
Finished setup for second CH4 release experiement

Western spotted orbweaver spider by the WP boardwalk. This spider was identified by an app in less than 1 second.
5305 20200821WP_Spider.jpg (2020-08-21 11:44:34 ) Full size: 1440x1920
Western spotted orbweaver spider by the WP boardwalk. This spider was identified by an app in less than 1 second.

Very dry and hot for second day of June
5542 20210602VR_DryDryDry.jpg (2021-06-02 11:21:46 ) Full size: 1920x1440
Very dry and hot for second day of June

The pond is very low for second day of June
5543 20210602VR_Pond.jpg (2021-06-02 16:00:20 ) Full size: 1920x1440
The pond is very low for second day of June

EXO screenshot from checking the EXO before we left. Second-to-last line shows the most recent field file only had 2 days of data from 2022-07-26 to 2022-07-28 8:55:59. Last line shows data collected since redeployment earlier today.
6071 20220804HS_ExoScreen3.jpg (2022-08-04 16:26:35 ) Full size: 1920x1440
EXO screenshot from checking the EXO before we left. Second-to-last line shows the most recent field file only had 2 days of data from 2022-07-26 to 2022-07-28 8:55:59. Last line shows data collected since redeployment earlier today.

Installed a second staff gauge in the channel to let us read water level during low tide when our primary staff gauge by the tower is high and dry. I had to scrape off a bunch of barnacles before attaching the gauge to the post.
6296 20230509HS_StaffGauge.jpg (2023-05-09 15:44:06 ) Full size: 1440x1920
Installed a second staff gauge in the channel to let us read water level during low tide when our primary staff gauge by the tower is high and dry. I had to scrape off a bunch of barnacles before attaching the gauge to the post.

Joe with jacked-up scaffolding. The east side of the tower is supported by two long metal posts clamped to the second level of the scaffolding.
6804 20240911MB_JoeJackedScaffolding.jpg (2024-09-11 15:10:57 ) Full size: 1440x1920
Joe with jacked-up scaffolding. The east side of the tower is supported by two long metal posts clamped to the second level of the scaffolding.

Page: [1]