Biomet Gallery

All Photos | Site Cam Gallery | Key words

View Details
Page: [1]
We moved a 2x12 plank from the edge of the platform to the middle so that we had more area to secure the scaffolding foot. The feet were drilled into the platforms and the scaffolding was tied down with a chain and turnbuckle attached to an eyebolt screwed into the platform (not pictured). The holes in the platform were later covered by chain link fencing.
5504 20210311HS_ScaffoldFeet.jpg (2021-03-11 12:37:06 ) Full size: 1920x1440
We moved a 2x12 plank from the edge of the platform to the middle so that we had more area to secure the scaffolding foot. The feet were drilled into the platforms and the scaffolding was tied down with a chain and turnbuckle attached to an eyebolt screwed into the platform (not pictured). The holes in the platform were later covered by chain link fencing.

Page: [1]