Biomet Gallery
All Photos | Site Cam Gallery | Key words
Large Photos
Page: [1]
ID | Name | Location | Date | Size | Camera | Thumb |
---|---|---|---|---|---|---|
293 | 20100908TW_Well.jpg Well pipe for water level at Twitchell Rice |
Twitchell Rice | 2010-09-08 10:00:34 | 3648x2736 | Canon PowerShot A480 | |
1290 | 20110621TW_WellDO.jpg Top of well pipe at the rice field |
Twitchell Rice | 2011-06-21 08:50:21 | 2560x1920 | DMC-TZ1 | |
3924 | 20140521EE_ErosionBoom.jpg A boom of about 4" PVC pipe has been installed all along the levee in places where the erosion has been worst. |
East End | 2014-05-21 12:02:45 | 1920x1440 | COOLPIX S9100 | |
5211 | 20200417BA_UndercanopyPAR.jpg A PAR sensor was installed under the alfalfa canopy to try to measure undercanopy PAR. The sensor is resting on a piece of foam and is protected on the sides by a PVC pipe. |
Bouldin Alfalfa | 2020-04-17 16:20:00 | 1920x1440 | iPhone SE | |
5302 | 20200805BC_BlackWidowEggSac.jpg Black widow spider and 2 egg sacs in the corn tower well pipe |
Bouldin Corn | 2020-08-05 15:08:44 | 1440x1920 | iPhone SE (1st generation) | |
6361 | 20231130MB_TestSoilCore.jpg Test soil core from PCV pipe in ankle deep water |
Mayberry | 2023-11-30 10:22:16 | 1920x1440 | iPhone SE (2nd generation) | |
6696 | 20240228GT_AdcpBox.jpg Using a well pipe to temporarily protect the ADCP cable because it's been cut twice in the last month. We will put it in metal conduit next time. |
Gilbert Tract | 2024-02-28 11:29:43 | 1440x1920 | iPhone 8 |