Biomet Gallery
All Photos | Site Cam Gallery | Key words
View Details
Page: [1]
1325 20110812TW_CR23X.jpg (2011-08-12 09:23:02 ) Full size: 2560x1920
CR23X data logger for met data
3390 20130411SI_PowerMeter.jpg (2013-04-11 09:24:10 ) Full size: 1920x1440
Sherman PG&E meeter
4218 20150120EE_Reinstrumented.jpg (2015-01-20 14:10:33 ) Full size: 1024x768
Reinstalled the flux and met sensors on the reconstructed scaffolding
4694 20170614EE_OpenWaterMet1.jpg (2017-06-14 15:20:02 ) Full size: 810x1440
One of the temporary towers is set up to measure open water. While the EC instruments are on the road, the met sensors are right next to or in the water.
4693 20170614EE_OpenWaterMet2.jpg (2017-06-14 15:20:09 ) Full size: 1920x1080
One of the temporary towers is set up to measure open water. While the EC instruments are on the road, the met sensors are right next to or in the water.
4715 20170817VR_rewire.JPG (2017-08-17 11:17:03 ) Full size: 1080x1440
Rewiring the met program from a CR23X to a CR1000
5025 20190403EE_CamiloMethaneFunnel.JPG (2019-04-03 12:53:21 ) Full size: 1080x1440
Camilo disturbing the wetland soil with a hoe and collecting methane in the funnel (precipitation bucket funnel), trying to collect enough to make an appreciable flame.
5036 20190523BA_MethaneRelease.jpg (2019-05-23 00:00:00 ) Full size: 1440x1920
Camilo releasing CH4 for footprint experiment
5500 20210311HS_MetBox.jpg (2021-03-11 16:53:50 ) Full size: 1440x1920
The start of a site -- a clean and organized datalogger encosure
6764 20240709BC_LithiumPowerPack.jpg (2024-07-09 14:52:48 ) Full size: 1920x1440
Adding a 24V lithium power pack in-line with our power system to buffer the met/flux systems from power interruptions
6796 20240807EE_MetBox.jpg (2024-08-07 14:22:29 ) Full size: 1440x1920
Inside of met box. This will need to be reorganized when we increase the scaffolding height.
6797 20240815EE_Box.jpg (2024-08-15 14:15:28 ) Full size: 1158x1920
Temporarily moved met box to short side of scaffolding to make space for adding additional half layer to raise height of eddy/rad sensors
6813 20241010TZ_TowerTopMethane.jpg (2024-10-10 12:45:23 ) Full size: 1440x1920
LI-7700 installed on the Tonzi Tower top
6815 20241010TZ_FloorMethane.jpg (2024-10-10 14:31:45 ) Full size: 1440x1920
LI-7700 added to the Floor tower
6839 20241105EE_OldMetBox.jpg (2024-11-05 15:57:39 ) Full size: 1440x1920
Enclosure on the bottom layer of scaffolding. Previously had the CR1000 and AM16/32 mux as well, which were moved to the new enclosure on the second layer of scaffolding. Two SHF plates are wired to the new enclosure through the white screw terminal. The AM25T has a long wire connecting it to the CR1000 in the new enclosure. I left the old power strip there for extra parts.
6838 20241105EE_NewMetBox.jpg (2024-11-05 15:58:22 ) Full size: 1440x1920
Page: [1]