5504 | 20210311HS_ScaffoldFeet.jpg We moved a 2x12 plank from the edge of the platform to the middle so that we had more area to secure the scaffolding foot. The feet were drilled into the platforms and the scaffolding was tied down with a chain and turnbuckle attached to an eyebolt screwed into the platform (not pictured). The holes in the platform were later covered by chain link fencing. |
Hill Slough | 2021-03-11 12:37:06 | 1920x1440 | iPhone SE (2nd generation) | |
5502 | 20210311HS_Chainlink.jpg Joe and Daphne installing chain link fencing to cover holes in platform. The ends of the fencing are fixed with tension bars that are either drilled into the platform or secured with u-nails. |
Hill Slough | 2021-03-11 12:48:06 | 1920x1440 | iPhone SE (2nd generation) |