Biomet Gallery
All Photos | Site Cam Gallery | Key words
Large Photos
Page: [1]
ID | Name | Location | Date | Size | Camera | Thumb |
---|---|---|---|---|---|---|
4886 | 20180905BA_clipplots2weekslater.JPG Clip plot bare area still clear 2 weeks later, with little new growth. |
Bouldin Alfalfa | 2018-09-05 12:52:30 | 1080x1440 | iPhone 5s | |
5501 | 20210311HS_SiteSetup.jpg Camilo and Robert installing flux sensors. The rad boom will be installed in a different position later in the day. |
Hill Slough | 2021-03-11 11:07:33 | 1440x1920 | iPhone SE (1st generation) | |
5504 | 20210311HS_ScaffoldFeet.jpg We moved a 2x12 plank from the edge of the platform to the middle so that we had more area to secure the scaffolding foot. The feet were drilled into the platforms and the scaffolding was tied down with a chain and turnbuckle attached to an eyebolt screwed into the platform (not pictured). The holes in the platform were later covered by chain link fencing. |
Hill Slough | 2021-03-11 12:37:06 | 1920x1440 | iPhone SE (2nd generation) |