Consturction of a berm for the tower site jutting into the field from the east.
1607 20081003TW_BermForTower.jpg (2008-10-23 13:49:51 ) Full size: 2048x1536
Consturction of a berm for the tower site jutting into the field from the east.

Runway at Moffett for zero flux experiment
271 20100901MF_Pano1.jpg (2010-09-01 11:54:08 ) Full size: 4000x3000
Runway at Moffett for zero flux experiment

Runway a Moffett for zero flux experiment
270 20100901MF_Pano2.jpg (2010-09-01 11:54:15 ) Full size: 4000x3000
Runway a Moffett for zero flux experiment

Runway a Moffett for zero flux experiment
269 20100901MF_Pano3.jpg (2010-09-01 11:54:22 ) Full size: 4000x3000
Runway a Moffett for zero flux experiment

Well pipe for water level at Twitchell Rice
293 20100908TW_Well.jpg (2010-09-08 10:00:34 ) Full size: 3648x2736
Well pipe for water level at Twitchell Rice

Hay bales laid down for erosion protection
905 mb_IMG_7576.jpg (2011-03-08 15:20:32 ) Full size: 1600x1200
Hay bales laid down for erosion protection

Soil sieving tables for root survey
1020 20110503TZ_SievingFirstPit.jpg (2011-05-03 11:30:13 ) Full size: 2560x1920
Soil sieving tables for root survey

CR23X data logger for met data
1325 20110812TW_CR23X.jpg (2011-08-12 09:23:02 ) Full size: 2560x1920
CR23X data logger for met data

Cows, fence down for LGR trailer
2454 SI_autocam_20120329_1115.jpg (2012-03-29 11:15:03 ) Full size: 1920x1440
Cows, fence down for LGR trailer

Fence down for work on mercury trailer
2640 SI_webcam_20120930945.jpg (2012-04-02 09:45:04 ) Full size: 640x480
Fence down for work on mercury trailer

New 4x4 post for the camera
2593 20120615MB_NewCameraPost.jpg (2012-06-15 11:32:32 ) Full size: 4000x3000
New 4x4 post for the camera

Possible view for autocam
2741 20120629WP_PossibleAutocamView.jpg (2012-06-29 14:35:55 ) Full size: 4000x3000
Possible view for autocam

Photoshoot for the DWR magazine
2770 20120712MB_PhotoShoot.jpg (2012-07-12 09:27:37 ) Full size: 4000x3000
Photoshoot for the DWR magazine

Boom folded in for cleaning
2823 WP_autocam_20120712_1015.jpg (2012-07-12 10:15:02 ) Full size: 1920x1440
Boom folded in for cleaning

Boom folded for field visit
2926 WP_autocam_20120823_1345.jpg (2012-08-23 13:45:02 ) Full size: 1920x1440
Boom folded for field visit

Boom folded for LI7700 calibration
2928 WP_autocam_20120906_1215.jpg (2012-09-06 12:15:02 ) Full size: 1920x1440
Boom folded for LI7700 calibration

Bird on tower - been there most days for a week
2956 TW_autocam_20120917_1545.jpg (2012-09-17 15:45:02 ) Full size: 1920x1440
Bird on tower - been there most days for a week

Bird on tower - been there most days for a week
2958 TW_autocam_20120919_1215.jpg (2012-09-19 12:15:02 ) Full size: 1920x1440
Bird on tower - been there most days for a week

Bird on tower - been there most days for a week
2960 TW_autocam_20120921_1315.jpg (2012-09-21 13:15:02 ) Full size: 1920x1440
Bird on tower - been there most days for a week

Birds on tower - been there most days for a week
2962 TW_autocam_20120924_0815.jpg (2012-09-24 08:15:03 ) Full size: 1920x1440
Birds on tower - been there most days for a week

New CR1000 for flux at Tonzi Floor
2978 20121009TZ_FloorCR1000.jpg (2012-10-09 08:36:39 ) Full size: 1920x1440
New CR1000 for flux at Tonzi Floor

New CR1000 for flux at the top of Tonzi Tower.
2980 20121009TZ_TowerCR1000.jpg (2012-10-09 11:39:11 ) Full size: 1920x1440
New CR1000 for flux at the top of Tonzi Tower.

Biomet lab on site for tram move
3349 tonzi_2013_03_27_093102.jpg (2013-03-27 09:30:18 ) Full size: 1296x960
Biomet lab on site for tram move

Plans for the new wetland on Twitchell
3437 20130502TW_notes.jpg (2013-05-02 09:24:47 ) Full size: 800x690
Plans for the new wetland on Twitchell

Crow or grackle coming in for a landing
3485 MB_autocam_20130531_0815.jpg (2013-05-31 08:15:02 ) Full size: 1920x1440
Crow or grackle coming in for a landing

Checking on a new location for a new scaffolding tower
3815 20140123MB_TowerMovePrep.jpg (2014-01-23 11:55:10 ) Full size: 1920x1440
Checking on a new location for a new scaffolding tower

The new boardwalks have been built. 4x4 post driven into the ground with 2x12 planking for a deck and a 2x4 railing
3813 20140123EE_NewBoardwalk.jpg (2014-01-23 14:13:32 ) Full size: 1920x1440
The new boardwalks have been built. 4x4 post driven into the ground with 2x12 planking for a deck and a 2x4 railing

Separate scaffolding set up in the channel for the solar panels and batteries
3835 20140307EE_NewSolarPanelMount.jpg (2014-03-07 13:36:59 ) Full size: 1920x1440
Separate scaffolding set up in the channel for the solar panels and batteries

Setting up for the Ameriflux intercomparison
3988 20140908MB_Ameriflux1.jpg (2014-09-08 13:26:21 ) Full size: 1920x1434
Setting up for the Ameriflux intercomparison

Two sets of eddy instruments and radiometers for the Ameriflux intercomparison
3987 20140908MB_Ameriflux2.jpg (2014-09-08 13:26:42 ) Full size: 1076x1440
Two sets of eddy instruments and radiometers for the Ameriflux intercomparison

Two sets of eddy instruments for the Ameriflux intercomparison
3992 20140910MB_Ameriflux1.jpg (2014-09-10 15:56:52 ) Full size: 1920x1440
Two sets of eddy instruments for the Ameriflux intercomparison

Two sets of eddy sensors for the Ameriflux intercomparison
3990 20140910MB_Ameriflux2.jpg (2014-09-10 15:57:39 ) Full size: 1920x1440
Two sets of eddy sensors for the Ameriflux intercomparison

Field mowed in preparation for wetland construction
4195 20150324SI_SiteMowed.jpg (2015-03-24 09:28:47 ) Full size: 1024x768
Field mowed in preparation for wetland construction

Moved tower out of the field for spraying and planting
4430 20160413TW_TowerMoved_tn.jpg (2016-04-13 15:33:41 ) Full size: 1920x1440
Moved tower out of the field for spraying and planting

UC Davis clipping for us
4568 TA_autocam_20160810_0945.jpg (2016-08-10 09:45:02 ) Full size: 1920x1440
UC Davis clipping for us

Location of soils sampled for carbon and nitrogen analysis
4601 20161111SW_SoilSampleMap.jpg (2016-11-11 00:00:00 ) Full size: 1088x755
Location of soils sampled for carbon and nitrogen analysis

We installed a new mount for the Li-7500 which is slightly diagonal, and not exactly vertical.
4645 20170315BA_newmountfor7500.jpg (2017-03-15 00:00:00 ) Full size: 810x1440
We installed a new mount for the Li-7500 which is slightly diagonal, and not exactly vertical.

Zero air and calibration gas for calibration LI7700 in the field.
4657 20170323MB_zerocalgas.JPG (2017-03-23 14:32:37 ) Full size: 1080x1440
Zero air and calibration gas for calibration LI7700 in the field.

Low water level at Mayberry as Bryan is draining and then refilling to correct for high salinity. Sam is getting air bubbles out of the fluorometer.
4677 20170427MB_lowwaterlevel.JPG (2017-04-27 12:44:05 ) Full size: 1080x1440
Low water level at Mayberry as Bryan is draining and then refilling to correct for high salinity. Sam is getting air bubbles out of the fluorometer.

New LI-7550 system provided by the Ameriflux Management Project for upgrading the Tonzi/Vaira LI-7500s
4696 20170615TZ_AMPBox.jpg (2017-06-15 11:30:57 ) Full size: 1920x1440
New LI-7550 system provided by the Ameriflux Management Project for upgrading the Tonzi/Vaira LI-7500s

New LI-7550 system provided by the Ameriflux Management Project for upgrading the Tonzi/Vaira LI-7500s
4697 20170615TZ_FloorAmpEquip.jpg (2017-06-15 12:57:10 ) Full size: 1440x1920
New LI-7550 system provided by the Ameriflux Management Project for upgrading the Tonzi/Vaira LI-7500s

Joe with 9 out of 12 AirT/RH sensors set up for testing. The last three sensor will go on the post supporting the flux sensors.
4803 20171218_JoeHMPtree.JPG (2017-12-18 12:01:37 ) Full size: 1080x1440
Joe with 9 out of 12 AirT/RH sensors set up for testing. The last three sensor will go on the post supporting the flux sensors.

Temporary mount for 7550 because we forgot the Licor mount.
4815 20180116BC_7550TempMount.jpg (2018-01-16 14:03:25 ) Full size: 480x640
Temporary mount for 7550 because we forgot the Licor mount.

Temporary fix for rotted power cable.
4821 20180123MB_TempCableFix.jpg (2018-01-23 12:03:27 ) Full size: 1440x1920
Temporary fix for rotted power cable.

Temporary solar panels (two 140W panels) set up for the winter.
4822 20180123MB_TempSolar.jpg (2018-01-23 12:03:48 ) Full size: 1440x1920
Temporary solar panels (two 140W panels) set up for the winter.

Black panel and IRT sensor for FLIR thermal camera calibration
4869 20180601TZ_BlackPanelForFLIR.jpg (2018-06-01 16:59:16 ) Full size: 1920x1440
Black panel and IRT sensor for FLIR thermal camera calibration

Kyle relocating some tules closer to the tower for future isotope chamber work.
4877 20180711SW_KyleTuleRelocation.jpg (2018-07-11 13:14:54 ) Full size: 1440x1920
Kyle relocating some tules closer to the tower for future isotope chamber work.

Two Bushnell cameras (from Silver lab), one raspberry pi zero w camera, and one Canon camera set up for a camera comparison study.
4889 20180918BA_CameraComparison.JPG (2018-09-18 11:48:48 ) Full size: 1920x1440
Two Bushnell cameras (from Silver lab), one raspberry pi zero w camera, and one Canon camera set up for a camera comparison study.

Mishal, Daphne and Karen ready to harvest litter for decomposition
4952 20181028EE_MishalDaphneKaren.jpg (2018-10-28 11:57:31 ) Full size: 1440x1920
Mishal, Daphne and Karen ready to harvest litter for decomposition

Alex, Mishal, and Karen on site collecting plants for litter decomposition experiment
5325 20181206EE_AlexMishalKaren.jpg (2018-12-06 21:00:31 ) Full size: 1440x1920
Alex, Mishal, and Karen on site collecting plants for litter decomposition experiment

Page: [1] 2 3