Biomet Gallery

All Photos | Site Cam Gallery | Key words

Large Photos
Page: [1]

IDNameLocationDateSizeCameraThumb
6373 20231208MB_FloatingAnalyzer.jpg
Floating a LI-7820 N20 analyzer in a plastic tote box. The box constantly wanted to tip over and dump the k analyzer in the water. Koong, Eddie, and Kuno are starting their first sample. Robert is wearing a LI-7810 CH4/CO2 analyzer in a backpack and making his way to our first collar.
Mayberry2023-12-08 09:55:05 1920x1440 iPhone 12 Pro Floating a LI-7820 N20 analyzer in a plastic tote box. The box constantly wanted to tip over and dump the k analyzer in the water. Koong, Eddie, and Kuno are starting their first sample. Robert is wearing a LI-7810 CH4/CO2 analyzer in a backpack and making his way to our first collar.
6372 20231208MB_EddieKoongKuno.jpg
Eddie, Koong, and Kuno walking around with two Licor analyzers and a homemade floating chamber to measure CH4/CO2 fluxes during Kuno's chamber/soil sampling campaign
Mayberry2023-12-08 09:55:31 1920x1440 iPhone 8 Eddie, Koong, and Kuno walking around with two Licor analyzers and a homemade floating chamber to measure CH4/CO2 fluxes during Kuno
6375 20231208MB_Wading.jpg
Koong, Eddie, and Kuno sampling at the edge of the channel
Mayberry2023-12-08 11:42:19 1920x1440 iPhone 12 Pro Koong, Eddie, and Kuno sampling at the edge of the channel
6744 20240626HS_Hsm2.jpg
Irene and Eddie taking a core at HSM_2
Hill Slough2024-06-26 13:47:57 1920x1440 iPhone 8 Irene and Eddie taking a core at HSM_2
6747 20240626HS_MuddyStroll.jpg
Irene and Eddie walking from HSM_2 back toward the tower
Hill Slough2024-06-26 14:08:00 1920x1440 iPhone 8 Irene and Eddie walking from HSM_2 back toward the tower
6829 20241024RR_NewEddy.jpg
Arshdeep and Eddie working at the tower. Fresh eddy sensors installed on the west side of the scaffolding. The solar panels in the background are temporarily propped up to access the batteries below the platform.
Rush Ranch2024-10-24 11:42:29 1440x1920 iPhone 8 Arshdeep and Eddie working at the tower. Fresh eddy sensors installed on the west side of the scaffolding. The solar panels in the background are temporarily propped up to access the batteries below the platform.
Page: [1]