Biomet Gallery
All Photos | Site Cam Gallery | Key words
Large Photos
Page: [1]
ID | Name | Location | Date | Size | Camera | Thumb |
---|---|---|---|---|---|---|
2374 | 20120131MB_CR1000Wiring.jpg Mayberry Tower CR1000 |
Mayberry | 2012-01-31 12:13:02 | 4000x3000 | COOLPIX S9100 | ![]() |
2851 | 20120822VR_CR1000.jpg CR1000 data logger in eddy box |
Vaira | 2012-08-22 12:32:27 | 1920x1440 | COOLPIX S9100 | ![]() |
2978 | 20121009TZ_FloorCR1000.jpg New CR1000 for flux at Tonzi Floor |
Tonzi | 2012-10-09 08:36:39 | 1920x1440 | COOLPIX S9100 | ![]() |
2980 | 20121009TZ_TowerCR1000.jpg New CR1000 for flux at the top of Tonzi Tower. |
Tonzi | 2012-10-09 11:39:11 | 1920x1440 | COOLPIX S9100 | ![]() |
4715 | 20170817VR_rewire.JPG Rewiring the met program from a CR23X to a CR1000 |
Vaira | 2017-08-17 11:17:03 | 1080x1440 | iPhone SE | |
6839 | 20241105EE_OldMetBox.jpg Enclosure on the bottom layer of scaffolding. Previously had the CR1000 and AM16/32 mux as well, which were moved to the new enclosure on the second layer of scaffolding. Two SHF plates are wired to the new enclosure through the white screw terminal. The AM25T has a long wire connecting it to the CR1000 in the new enclosure. I left the old power strip there for extra parts. |
East End | 2024-11-05 15:57:39 | 1440x1920 | iPhone 8 | ![]() |