Biomet Gallery
All Photos | Site Cam Gallery | Key words
View Details
Page: [1]
4670 20170426BC_Trench.jpg (2017-04-26 12:48:29 ) Full size: 1440x1920
We used a rented trencher to dig a 12in deep trench from the northwest corner of the porch, just past the end of a north-south drainage ditch to the tower location. It crosses both roads at a diagonal. The power cable (two conductor #10 with ground UF-B direct burial cable) is in 3/4in plastic conduit at the bottom of the trench.
5212 20200417BA_FDChambersUnderTower.jpg (2020-04-17 17:18:12 ) Full size: 1920x1440
Two FD chambers under the alfalfa tower. Both are on bare soil.
5214 20200417BA_FDChamberConnectors.jpg (2020-04-17 17:34:09 ) Full size: 1440x1920
The newly installed FD chambers at both BA and BC has their data connector hanging underneath the datalogger box.
5848 20200426GT_LonelyStake.jpg (2022-04-26 09:53:39 ) Full size: 1440x1920
Stake and hose clamp but no game camera...both game cameras were taken so no more otter videos.
5865 20220527BC_RoadClosed.jpg (2022-05-27 17:30:25 ) Full size: 1440x1920
Both Hwy 12 and the field road to the north were closed for about
Page: [1]