Biomet Gallery

All Photos | Site Cam Gallery | Key words

View Details
Page: [1]
We used a rented trencher to dig a 12in deep trench from the northwest corner of the porch, just past the end of a north-south drainage ditch to the tower location. It crosses both roads at a diagonal. The power cable (two conductor #10 with ground UF-B direct burial cable) is in 3/4in plastic conduit at the bottom of the trench.
4670 20170426BC_Trench.jpg (2017-04-26 12:48:29 ) Full size: 1440x1920
We used a rented trencher to dig a 12in deep trench from the northwest corner of the porch, just past the end of a north-south drainage ditch to the tower location. It crosses both roads at a diagonal. The power cable (two conductor #10 with ground UF-B direct burial cable) is in 3/4in plastic conduit at the bottom of the trench.

Two FD chambers under the alfalfa tower. Both are on bare soil.
5212 20200417BA_FDChambersUnderTower.jpg (2020-04-17 17:18:12 ) Full size: 1920x1440
Two FD chambers under the alfalfa tower. Both are on bare soil.

The newly installed FD chambers at both BA and BC has their data connector hanging underneath the datalogger box.
5214 20200417BA_FDChamberConnectors.jpg (2020-04-17 17:34:09 ) Full size: 1440x1920
The newly installed FD chambers at both BA and BC has their data connector hanging underneath the datalogger box.

Stake and hose clamp but no game camera...both game cameras were taken so no more otter videos.
5848 20200426GT_LonelyStake.jpg (2022-04-26 09:53:39 ) Full size: 1440x1920
Stake and hose clamp but no game camera...both game cameras were taken so no more otter videos.

Both Hwy 12 and the field road to the north were closed for about
5865 20220527BC_RoadClosed.jpg (2022-05-27 17:30:25 ) Full size: 1440x1920
Both Hwy 12 and the field road to the north were closed for about

Page: [1]