Equipment and Calibration History

View Equipment |

View history entry 791 for Campbell Sci. CS511 sn: DO-2

Date: 2012-09-27
From: Mayberry - DO Sensor A
To: Lab - none
Title: Removed
Notes: DO-02 was removed from the upper water location at the Tule tower because it ws reading -INF. Inspection in the lab showed that the inner metal coil had corroded to the point of developing a gap in one of the loops.
Entered by:
Field notes