Equipment and Calibration History

View Equipment |

View history entry 4352 for MorningStar PS-30M sn: 11400080

Date: 2020-01-30
From: East Pond - Solar Controller
To: Sherman Wetland-Temp1 - Solar Controller
Title: Moved
Notes: Removed with the decommissioning of the EP tower and installed at the new SW Temporary site 1250m upwind of the Permanent Tower.
Entered by: Joe Verfaillie
Field notes