Equipment and Calibration History

View Equipment |

View history entry 3093 for Trace Engineering C60 sn: SCC-001

Date: 2017-09-28
From: Tonzi -
To: Lab - none
Title: Removed
Notes: Removed from the Tonzi Tower solar system. The system was upgraded with a new MPPT charge controller.
Entered by: Joe Verfaillie
Field notes