Equipment and Calibration History

View Equipment |

View history entry 2183 for Licor LI-820 sn: CGA-556

Date: 2016-02-23
From: Lab - none
To: Tonzi-Tower -
Title: Installed
Notes: Reinstalled in the Tower CO2 profiles system, but the pump was not working and was removed. The IRGA was left unpowered.
Entered by: Joe Verfaillie