Equipment and Calibration History

View Equipment |

View history entry 1175 for Youngryel Ryu LED-4chan sn: RYU-01

Date: 2013-11-07
From: Lab - none
To: Tonzi-Tower -
Title: Installed
Notes: Reinstalled on the Tonzi Tower. A wiring error swapping the Red and NIR channels was fixed. New Teflon filter.
Entered by: