Equipment and Calibration History

History for Hukseflux HFP01 002211

Rec No.DateLoc FromTitleLoc ToNotes
5699 2022-02-14 Lab none Disposed Disposed none This plate is in the lab broken in pieces to see how it works. The cable is in good condition. It might have been broken by a plow in the field.
779 2012-09-06 Twitchell Rice Heat Flux Plate D Removed Lab none Removed from the Twitchell tower for calibration. This was #2 of three SHF plates.
1740 2009-04-03 Lab none Installed Twitchell Rice Heat Flux Plate D Installed with the initial set up of the Twitchell Rice tower.
130 2007-05-09 Factory Calibration Factory Initial factory calibration: 63.1 uV/W/m2