Equipment and Calibration History
View Equipment |
Date: |
2013-04-10 |
From: |
Lab - none |
To: |
Tonzi-Tower - |
Title: |
Installed |
Notes: |
This sensor was installed on the radiation boom at the top of the tower. It is next to the existing NR-lite and wired to the AM16/32 on the CR23X6 |
Entered by: |
|
|
|