Equipment and Calibration History
View Equipment |
Date: |
2013-04-19 |
From: |
Lab - none |
To: |
Tonzi-Tower - |
Title: |
Installed |
Notes: |
Installed on the Tonzi tower at the 2nd from bottom (1.8m) CO2 profile inlet location. Wired to the AM16/32 multiplexor connected to the tower top CR23X |
Entered by: |
|
|
|