Equipment and Calibration History
View Equipment |
Date: |
2013-03-13 |
From: |
Lab - none |
To: |
Tonzi-Tower - |
Title: |
Installed |
Notes: |
Installed in the cr23x box near the top of the tower in preparation for adding new diffuse PAR and 4-band radiometer. Currnetly not connected. |
Entered by: |
|
|
|