Equipment and Calibration History

History for Campbell Sci. AM16/32B 27703

Rec No.DateLoc FromTitleLoc ToNotes
4617 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
4587 2020-07-09 Lab none Loaned Loaned none Given to Sabina of Hydrofocus with the Sherman Barn system. This was an extra mux to replace the old, failing mux sn 11662.