Equipment and Calibration History

History for Hukseflux HFP01SC 2500

Rec No.DateLoc FromTitleLoc ToNotes
3674 2012-01-09 Lab none Installed Tonzi Installed at about 1m agl at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.