Equipment and Calibration History

History for BP Solar SX350J T21009229B37030

Rec No.DateLoc FromTitleLoc ToNotes
3672 2012-01-09 Lab none Installed Tonzi Installed at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.