Equipment and Calibration History
View Equipment |
Date: |
2012-05-21 |
From: |
Lab - none |
To: |
DWR Corn - |
Title: |
Installed |
Notes: |
Installed in a small enclosure on south side of the DWR Corn scaffolding. Connected to two solar panels and four deep cycle baterries. |
Entered by: |
|
|
|
Field notes